
On May 31st, PSA Breakbulk handled the first two impressive heavy-lift components for Gosselin Logistics, ordered by Ineos Project One.
The project cargo, a splitter (591t) and demethanizer (347t), arrived from Spain by MV Happy Star and were safely discharged onto Felbermayr's 32 axle SPMTs, which transported the heavy-lifts onto Sarens' stool arrangement.
Dennis Verbeeck, General Manager PSA Belgium Non-container: "This achievement once again underscores the professionalism and dedication of the Breakbulk team. Thanks to your commitment and expertise, we can be proud of this successful operation. A big thank you!"