Churchill South Terminal

Dedicated Project Cargo Ecosystem

Dedicated and fully equipped asset for large scale project pre-dressing and marshalling

About this terminal

Reaching the terminal

Directions

Address
Zomerweg 1, BE 2030 Antwerpen Route
GPS
51.278589, 4.361334

Churchill South Terminal

Quay length (m)
560
Max depth (m)
13
Area (ha)
14
Cranes
1 LR 1750 (max lift 750T)
Mobile cranes
1 (max lift 125T)
Rolling equipment
SPMT - Axle lines
410