PSA Breakbulk welcomes impressive components for Ineos Project One

Recently, PSA Breakbulk welcomed some truly impressive components by Gosselin Logistics, ordered by Ineos Project One. 

The enormous C3 Splitter measures no less than 93 meters in length and weighs a mind-boggling 589 tonnes. Along with the wash tower, gas dryers and water tower, all units were safely unloaded onto our terminal. This would not have been possible without the support of Felbermayr's 32-axle SPMTs, that allow us to move these heavy-lifts across our terminal.

Thanks to all parties involved for the great cooperation during these heavy-lift operations and special thanks to Gosselin Logistics for the spectacular video!